Payment Terms and Delivery Date
Payment Terms
1. 30% deposit of the total will be paid after signing the contract.
2. We will arrange the production of the equipment at once after rceiving the 30% deposit.The left 70% of the payment will be finished after all the equipment s are finished.We will arrange the delivery upon receipt of the left payment.
3. The allowance for installation works should be paid after the equipment installation and debugging are completed.
Delivery Date
We will send out the equipment you order to you in one month after receiving your payment.
Get the latest price? We'll respond as soon as possible(within 12 hours)
more products
Products
- Aluminum Wood Drying Kiln
- New Type Steaming Heated Kiln for Wood Dryer
- Hot Water Drying Chamber For Wood Drying Machine
- Heat Transfer Oil Drying Kiln Drying Equipment
- Natural Gas Drying Kiln For Wood Dryer Machine
- Radiata Pine Drying Kiln Drying Chamber For Wood
- Rubber Wood Drying Kiln Timber Drying Chamber
- Rosewood Drying Kiln Channel Kiln For Wood
- Bamboo Drying Kiln Drying Machine
- Intelligent Wood Drying Kiln With Easy Operation
- Heat Pump Drying Kiln
- Heat Pump Wood Drying Kiln Dryer Without Boiler
- Heat Pump Drying Kiln for food
- Veneer Drying Equipment
- Track Veneer Drying Kiln
- Veneer Roller Dryer machine
- 3-layer Net-Belt Veneer Dryer for wood
- Wood carbonization kiln
- High Frequency Vacuum Wood Carbonizating Kiln
- Special kiln for carbonization of bamboo chips
Featured Products
Contact Details